Mercy Health Muskegon

We have been tasked with the plumbing and medical gas piping for renovating the entire existing hospital. This is a 5-story building with over 100,000 ft. of piping in our scope of work. We are working closely with Christman from the pre-construction design assist, through the BIM process, and to installation of these new systems. This will be a 2 year project, with the biggest challenge for our crews being installing the systems by phase while other areas of the hospital remain open to patients.